Abstract:Either weak or bad soil is often encountered in the engineering construction projects of coastal areas. It is a difficult problem, especially when the construction site is limited by the boundary of underground structures such as rail transit. The soft foundation to be treated in this paper is that of a planned urban rail transit line in the coastal area of Jiangsu Province. Because the long-term planned rail transit line is buried under the foundation, the treatment depth is limited, and the final treatment method is determined to be the interlocking pile arrangement. The solid deep foundation method and Midas GTS software are used for the design and checking calculation.