Douguan Elevated Station in Guiyang Rail Traffic Line 1 is a "bridge-station combined structure" system. Its pier is a long-cantilever bent cap single-column pier. Two different stress systems are combined together. The stress of "bridge-station combined" elevated station is complex. The influences of shrinkage, creep and temperature on the spatial framework system are analyzed, and the stress of long-cantilever pre-stressed concrete bent cap is introduced. The design methods and results can provide the reference for the design of the similar elevated stations.