Abstract:Taking the construction of 9# pier base slab of Jialing River Bridge in Longxi as an example, firstly it is verified that the embedded cooling water pipe has a significant effect on reducing the concrete temperature. Then, the sensitivities of cooling pipe flow, cooling pipe diameter, cooling pipe spacing and other factors to the effect of reducing concrete temperature are analyzed. Finally, according to the above study conclusions, the optimal scheme for the embedding of cooling water pipe is obtained, and it is verifies that the concrete stress and normal crack ratio of the optimal scheme are in conformity with the Code for Design of Concrete Structures GB 50010-2010.