Abstract:In order to achieve the scheme optimization and investment savings, aiming at the complex interconnected nodes between Dongcheng Avenue and Zhonghuan Avenue, the study, comparison and selection are further carried out. By analyzing the planning and current conditions of Dongcheng Avenue, the problems existing in the original planning scheme are found, and the specific optimization suggestions are put forward. On this basis, the node schemes of Zhonghuan Avenue and Tiedong Road are specially selected and compared. The overall design scheme of the project is determined through the study on line optimization, and node scheme comparisons.