Abstract:Aiming at the problem of traffic congestion seriously restricting the overall development of a city, the urban roads are reconstructed in expressway, which can effectively relieve the traffic pressure of ground road. Combined with Wuhan Xiongchu Avenue (Meijiashan Interchange - Chuping Road) Reconstruction Project, how to reasonably select the construction form and scale of expressway and how to deal with the contradiction between the social economy and urban development demand are demonstrated. Three schemes of expressway cross section design are compared and selected. And the treatment mode of important intersection nodes of expressway is studied. The study result shows that the construction form of "elevated road + ground auxiliary road" is recommended. The double-way six-lane scale is used for the main road and auxiliary road respectively. The 11-m lateral dislocation BRT platform scheme is used in cross section.