Abstract:The steel truss beam bridge spanning Shanghai-Nanjing Expressway in Bid 02 of Fengxiang Road Rapid Reconstruction Project is a two-span continuous beam bridge with the layout of 165 m+90 m span. The triangle truss without vertical bar is used. The steel truss beams are manufactured in factory and assembled on site. The connection between the members is all welded. The plane of the main truss is on a straight line and its fa?ade is on a -2.5% longitudinal slope of easement curve. The 98-m guide beam is set for the construction of steel truss beam, which spans Shanghai-Nanjing Expressway by the dragging and slipping method.