Abstract:As a mature construction technology, the full framing method is widely used in the construction of cast-in-place girders of urban bridges. It has the advantages of convenient construction, short turnover time and less auxiliary equipment. But for the cast-in-place box girder with straight web, especially the cast-in-place box girder with narrow main girder, the existence of the lateral pressure of concrete, the horizontal load produced by dumping concrete and the horizontal load produced by vibration makes the support at the web have a large horizontal thrust to put the whole structure in a dangerous state. Based on a project, two solutions are put forward to improve the stress state of the structure by adjusting the inclined brace arrangement. The results show that both schemes can effectively reduce the phenomenon of local stress concentration of structure caused by horizontal thrust, which is beneficial to the uniform transfer of unfavorable load to the whole framing structure.