Abstract:The layout of side spans for a single-track continuous beam bridge is(40+64+40)-m. The construction method is the diamond-shaped form traveler cantilever pouring method. The steel-tube support for the cast-in-place side spans of bridge is designed and calculated. The checking calculation contents are mainly the strength and stiffness of the square wood under the bottom mold, the strengths and stiffness of longitudinal beam and bearing beam, the strength and stability of stand column, and the foundation. The related requirements are met through the checking calculation of strength, stiffness and stability of support.