Abstract:These two factors of geological survey and foundation treatment scheme will influence the calculation of construction settlement. Based on this, combined with a municipal road soft foundation embankment treatment project, the dynamic settlement control method is discussed. The significance of soft foundation quality exploration is made clearly. The common soft foundation schemes of replacement method, riprapping method, preloading method and cement mixing pile method are discussed. The preloading method as an example is analyzed. The design of construction scheme and the calculation of consolidation settlement are introduced in detail. Finally, the dynamic settlement control method is proposed, which can be referred for the similar projects.