Abstract:The use of industrialization mode can improve the efficiency of bridge construction, has the advantages of economy and environmental protection property, and has achieved the considerable development in China. Based on the G312 (Nanjing Ring Interchange - Xianyin North Road) Reconstruction and Extension Project, the selection and design methods of bridge prefabricated substructure in the context of urban construction are studied. Through the consideration of performance requirements and transportation conditions, and the selection of series fabricated substructure represented by long-cantilever inversed-T semi-hidden bent cap, the design methods of height, width and corbel width parameters are determined. By considering the transportation condition restrictions and construction convenience demands, the division method of super-wide bent cap and large-sectional pier is proposed. Based on the performance demands, construction error analysis and technical maturity, the connection methods between bent caps, bent cap and pier, and pier and base slab are selected.