Abstract:Combined with the vertical planning of road network and site of the high-speed railway west station area in Jingmen, the characteristics of vertical planning and design of high-speed railway hub area under complex topographic condition are analyzed. The reciprocal feedback flow of vertical planning and design is put forward. The vertical control factor essentials, vertical zoning, earthwork filling and exaction requirements, earthwork calculation and deploying method are sorted out from two aspects of the road network and site vertical planning and design. The conclusion shows that the comprehensive requirements of railway, municipal road, ground drainage flood control, land usage, earth-rock balance, urban landscape and engineering construction should be considered in the road and site vertical planning under the complex topographic condition. The reciprocal cross-feedback should be given to the vertical planning and design of road and site in order to meet the overall balance of earthwork, the economic and reasonable engineering construction, and to realize the reasonable feasibility of overall vertical planning and design scheme.