Abstract:The concrete engineering practice of binhai industrial park is taken as an example in this paper. Its road characteristics is briefly analysed. The key design points to be noted of the road reconstruction project of the industrial park and the corresponding measures that can be taken are expounded, such as the reasonable arrangement of underground pipelines and the traffic organization during the construction period, the selection of the base course of pavement structure, measures for temporary sewage discharge during the construction period, road identifiability and other measures. The design experience is provided as a reference for other similar projects.