Abstract:The reconstruction and extension project of Shenzhen Jihe Expressway is the first proeject of double-layer three-dimensional composite expressway in China. As there are many interchanges along the expressway, it is necessary to study and design its reconstruction and expansion scheme. In this paper, the present situation of the expressway is analyzed and the traffic volume is forecasted. Under the overall scheme of rebuilding and expanding the main line into a double-layer three-dimensional composite expressway, and combined with the traffic function, traffic volume and surrounding conditions along the line, it is compared and contrasted in this paper of the design scheme of rebuilding and expanding the interchanges between Jihe Expressway and two adjacent urban roads. The recommended scheme is thus determined. Through simulation and evaluation, it is found that the overall service level of the proposed interchange is good, the traffic operation is smooth and the two adjacent roads meet the annual traffic demand in the long term. Therefore, the traffic pressure is relieved.