Abstract:In order to guarantee the engineering construction quality of pumping house, the professional construction scheme and technical level are the keys. By summarizing and analyzing the general construction schemes of pumping house, its construction is divided into three stages of infrastructure, main part and masonry painting. The important and difficult points of construction technology in each stage are analyzed separately. The relevant construction technologies and the quality control essentials in the formwork engineering, rebar engineering and concrete engineering are put forward. The control indexes of the relevant design parameters are summarized. The references are provided for the similar projects.