Abstract:Based on Nanzhuang Bridge with a 268-m span in Foshan, the structural system and construction scheme of a single-pylon double-plane composite girder cable-stayed bridge are introduced. The reasonable finished state of the bridge is obtained by the study. On this basis, the static analysis results of the construction stage and the service stage are given, and the overall stability and safety of the structure are evaluated.