Abstract:Taking the main road of Shabing Road in Baoshan City of Yunnan Province as an example, by introducing the current situation of Shabing Road, the construction conditions along the line, land usage and road functions at both sides, engineering scale and overall economic benefits are analyzed. The separated roadbed design scheme is proposed. The application effect and design essentials of separated roadbed in urban road are summarized, which can be referred for the road design under the similar construction conditions.