合铜黄高速特大桥制造安装工艺
作者:
作者单位:

(海波重型工程科技股份有限公司, 湖北 武汉 430207)

作者简介:

吕正东(1994—), 男, 本科在读, 助理工程师, 从事钢结构桥梁焊接技术管理工作。

通讯作者:

中图分类号:

U445

基金项目:


Brief Analysis of the Manufacturing and Installation Process of Yetonghuang Large High-Speed Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    合铜黄特大桥为主跨280 m的下承式箱型截面提篮拱桥。主桥工程范围内平面线形圆曲线接直线,位于2.074%单向纵坡上,拱肋采用钢箱截面,主桥桥面结构宽31.0 m,桥面外侧左右两道。以该项目为背景,探讨箱型截面提篮拱桥的制造、安装关键工艺技术。

    Abstract:

    Hetonghuang Bridge is a box- cross-section basket arch bridge spanning 280m. Within the scope of the main bridge project, the plane linear circular curve is connected to the straight line, which is located on the 2.074% one-way longitudinal slope. The steel box section is adopted for the arch rib. The width of the main bridge deck structure is 31.0 m, and the outside of the bridge is on the left and right. Based on this project, the key technology of manufacture and installation of box cross section basket arch bridge is discussed.

    参考文献
    相似文献
    引证文献
引用本文

吕正东,桂文涛,叶 顺.合铜黄高速特大桥制造安装工艺[J].城市道桥与防洪,2021,(4):132-134.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2020-09-01
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-08-12
  • 出版日期:
关闭