Abstract:Through the enclosure construction of occlusion pie for a foundation pit in a waterworks in Shanghai, the problems easy to occur in the construction of hard cut pore-forming occlusal row pile by a full casing rotary drilling machine in the complex soft soil layer with confined water are analyzed, and the used relevant construction measures and construction essentials are expounded in order to guarantee the construction quality of the project and provide the reference for the construction of the similar projects.