Abstract:Through the construction of a large-span steel structural factory building of a cold rolling project second tender section in a large iron and steel group in China, combined with the successful experience of steel structure construction and installation of previous projects, the installation and construction methods of large-span super-high single-story steel structure factory building are expounded. Under the premise of ensuring the safety and quality, the scientific construction methods are used to quicken the engineering progress and solve the difficulties in the construction of large-span super-high single-story steel structural factory building, which can provide the corresponding reference for the construction of similar projects.