Abstract:The traditional study on the traffic organization during the construction period is generally aimed only at a single construction project. There is often a building boom before a particularly big event in cities, which will form a large area of concentrated construction and have a great impact on the operation of urban road network. Its traffic impact needs to be systematically evaluated from a global perspective. Aiming at a large scale of construction projects and the construction impact on the overall traffic of road network, the assessment technologies, such as the division of road network sensitive road section, calculation of road network traffic capacity loss, and prediction of traffic congestion index based on traffic model. These technologies are applied in the construction of major infrastructures for Hangzhou "Welcome Asian Games" with the good application effects.