Abstract:Taking Nanping Expressway Phase III in Shenzhen as an example, according to two situations of current interchange reconstruction and newly built interchange, the application of interchange type selection in the design of expressway interchange is systematically introduced when the construction conditions of urban buildings, land, mountains, basic farmland, high-voltage lines, and major pipelines are restricted. The conclusions obtained can be used as reference for the peers.