Abstract:Huaizhou Tuojiang River Bridge is an extra-large cable-stayed bridge and is a landmark image project of travel ring line. Its main pier pile foundation is very important as bridge control engineering. The piers 12#~14# of Tuojiang River Bridge are located in the riverbed of Tuojiang River. It must be to ensure the smooth completion of bridge substructure before the flood season. It is proposed to build an island of earth and stone around the main pier and auxiliary pier. The scheme of rotary excavator to drill holes and vibratory hammer to insert is used quickly to form the steel sheet pile cofferdam and synchronously to implement the steel trestle. How to effectively complete the substructure construction is studied. The result shows that the use of method to build an island in water, steel sheet pile cofferdam and steel trestle is effective, safe and reliable, can speed up the construction schedule, reduce the construction period, smoothly complete the substructure before the flood season, and at the same time ensure the construction quality. The costs of construction periods are all within the controllable range.