Abstract:In order to solve the problem of resident travel in North Jiuting Area in Songjiang District of Shanghai and to improve the traffic environment of the area, the temporary on-ramp of G50 located at North Huting Road should be moved to Jiudu Road on the west side, and the toll gate and management house should be constructed. The Jiudu Road should be locally widened due to the changes of traffic functions and volume. Therefore, under the construction conditions, combined with the traffic demand of Jiudu Road, many schemes for section layout are compared. In order to take into account all kinds of traffic demands, traffic efficiency and safety, finally the form of 5-lane motorway and common-plate section of pedestrian and non-motored vehicle adopted in the boundary lines of roads is recommended. This project is in good condition after completed and opening to traffic. The comparison and layout mode of section can provide the reference for the similar road widening projects.