Abstract:MIDAS/civil finite element software is used to calculate and analyze a 330-m double-pylon cable-stayed bridge of an expressway. Based on the minimum bending energy method, the reasonable completion state of the bridge is determined. Based on the unstressed cable length, the normal installation analysis of the construction process is carried out. Finally, according to the current specifications, the stress, deflection, dynamic characteristics and stability of the bridge are checked and calculated. The calculation results can provide reference for related studies.