Abstract:In order to reduce the impact on the safety of underground structures, the trenchless pipeline construction method has been one of the best construction schemes of municipal water supply and drainage pipelines. Relying on a new road drainage project of Nanchang, the impact of the double pipe jacking construction on the upside existing electric power square culvert is analyzed through the finite element numerical simulation analysis. The results show that there is difference between the impacts of the double pipe jacking parallel construction at the same time and the single construction one by one on the settlement of the existing structures. And the impact of the double pipe jacking parallel construction at the same time is larger. In the practical projects, the double pipe jacking construction can be also used because of the construction period and other factors. But it is necessary to strengthen the monitoring on the settlement of the existing structures during construction, and the related protection measures should be done well.