Abstract:As a distribution centralized bearing area of non-capital functions of Beijing, Xiong'an New Area is required to improve its regional integrated transportation network and build its convenient traffic system. On the basis of master planning and urban design study, the regional traffic prediction model of Xiong'an Intercity station and Xiaoli Station is built, and the population limit is adopted for testing. The prediction model is further applied to check and analyze the streamline layout by the mutual feedback results of model prediction and transportation streamline layout. The study conclusion shows that the suitable construction scale of road network can support the traffic demand around the hub area of Xiong'an Intercity Railway Station and Xiaoli Railway Station within the planning years. It can be implemented to set the east-west axis and some branch roads around the intercity station as one-way traffic. The design of underground ring roads within the study scope optimizes the traffic organization, which can effectively alleviate the traffic pressure of ground roads between two stations.