Abstract:Dongcheng Avenue is an important part of the outer ring in the "double-ring, four-link and eight-shoot" expressway system of Kunshan. The overall scheme of its expressway reconstruction is designed and studied. Relying on the functional demand analysis, based on the traffic flow analysis, the important nodes and controlling substances along the route are sorted out. Especially for the control conditions of two existing tunnels, two overall design schemes are proposed. And the schemes are demonstrated, compared and selected. Finally considering the control factors of old tunnels, steel high-voltage towers and important trip nodes, the overall design scheme and the entrance-exit layout are determined. The effect is good.