Abstract:The main navigable span bridge of Zhoudai Cross-sea Bridge is the largest-span three-pylon steel box beam offshore cable-stayed bridge on the world now. Based on the practical experience in the construction safety management of the main pylon of Zhoudai Cross-sea Bridge, the main safety risks of the hydraulic creeping formwork in the construction of offshore high pylon are analyzed, and introduced from the creeping formwork installation, creeping formwork climbing and creeping formwork day-to-day management. The safety management essentials and risk control measures in the offshore hydraulic creeping formwork construction are specially expounded. The relative experience can be referred for the professionals of the similar projects.