Abstract:Aiming at the characteristics of the deck pavement of South-north Elevated Bridge in Shanghai, combined with the construction conditions of close traffic at the night and open traffic during the day, three common pavement treatment measures of preventability maintenance, planing and covering, and on-site thermal regeneration are selected and analyzed. It is further to compare the planning and covering measures, and the technically feasible preventability maintenance schemes of asphalt reductive treatment, sand mist seal and micro surfacing from the aspects of disease treatment effect, design service life, construction speed and construction quality stability. The recommended scheme of planing and covering is determined. The process and conclusion of scheme comparison can be referred for the similar projects.