Abstract:With the continuous deepening of urban development, the role of the pipe-jacking construction technique is more remarkable in the urban municipal pipeline and channel projects. Facing the more and more complex construction environment and social environment pressure, on the basis of the straight pipe jacking technique, the curve pipe-jacking construction technique solves the problem that the straight pipe jacking is hard to solve, plays the huge economic and social effects, and is also greatly developed. Based on its particularities of the project, two adverse factors of curve pipe jacking and shallow overburden soil should be overcome. Due to the great construction difficulties, it is required to strictly control the mechanical equipment modification, axis lofting, process measurement and deviation rectification, in addition required to ensure the protected structures within the curve. The construction technologies are expounded mainly from the aspects of axis lofting and traction control. The emphasis is on the site construction, which provides the reference for the construction of curve pipe jacking in the different environments.