Abstract:Based on a practical engineering case, Midas/Civil software is used to analyze three ways (adding the upturn beam and ground beam, adding the pilaster, and using the local reinforcement of the residual structure to resist the soil load effect without compensation) to deal with the opening at the intersection of channels. Through the improvement of slab stress condition, the adjustment of foundation reaction force, and the comparison of construction difficulty and economy, the optimization way of using the local reinforcement of the residual structure to deal with the opening of the thick plate structure without compensation is obtained.