Abstract:Through research, analysis, theoretical calculations, laboratory tests and engineering applications, a complete set of design and construction techniques is formed for local reinforcement of weak foundation and treatment of abandoned soil as road subgrade or site filler. The technical bottleneck is broken by solving the difficulties in both of the utilization of abandoned high water-containing soil from urban construction projects and resourse promotion. Both of the on-site comprehensive utilization of abandoned soil and the "zero waste" balance of earthwork of single or multiple projects are achieved. Meanwhile, after combination with the implementation verification and tracking observation of the test section of Xihong Bridge in Ningbo, the technology and complete process are proposed for subgrade filling after solidifying soft foundation and waste silt soil(mud) in soft soil area. This research has the extensive popularization value for the utilization of abandoned soil and earthwork balance in soft soil areas.