Abstract:Taking the two-stage design of the G319 Ruijin - Xingguo (Xingguo Section) Rerouting Project as an example, the design schemes of the route layout along the natural gully and the subgrade occupying the natural gully are explored. The overall drainage system is reasonably arranged. The calculation and analysis are carried out to determine the size of each component system of the drainage system. At the same time, the corresponding construction scheme is designed. The complete design idea is provided for the design of similar projects in the future.