Abstract:For cable-stayed bridges, steel anchor beam is a component connecting cable and main tower. It is arranged in the tower column layer by layer. The stay cable is anchored to the steel anchor beam after passing through the conduit pipe. The main tower of Shanghai-Suzhou-Nantong Yangtze River Bridge is far from the shore and is characteristic with large span, high tower and big plane size. Introduced in this paper are the method and technology of accurate positioning of steel anchor beam under the adverse conditions of strong wind, sunshine temperature change, tower torsion deformation, complex construction environment, etc. The research results can be used for reference to other similar cable-stayed bridges.