Abstract:view of the special geological conditions of high filling and deep silt foundation around the tunnel, combined with the practical engineering cases, the revetment design under the different filling treatment schemes combined with the road subgrade design is introduced, which provides the reference for the design and research of the revetment under the similar special conditions.