深圳市某污水处理厂提标扩容工程节地工艺设计方案
作者:
作者单位:

[上海市政工程设计研究总院(集团)有限公司, 上海市 200092]

作者简介:

沙超(1989—), 男, 硕士, 工程师, 从事排水设计工作。

通讯作者:

中图分类号:

X703

基金项目:


Land-saving Technological Design Scheme for Upgrading and Expansion of a Wastewater Treatment Plant in Shenzhen
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    深圳某污水处理厂提标扩容工程将设计规模由6万m3/d扩容至16万m3/d,设计出水水质由《城镇污水处理厂污染物排放标准》(GB 18918—2002)中的一级B标准提升至《地表水环境质量标准》(GB 3838—2002)中的准Ⅳ类水标准。本工程实际用地面积仅为4.2 hm2,通过原有构筑物拆除,新建了一套设计规模16万m3/d的污水处理设施,提标扩容工程采用多段AO生物反应池+双层二沉池+磁混凝沉淀池+紫外消毒的工艺流程。本工程总投资为52 165万元,单位经营成本1.03元/m3。本工程主体工程于2019年建成通水,水质能够稳定达到准Ⅳ类水标准。

    Abstract:

    The design scale of a wastewater treatment plant (WWTP) upgrading and expansion project in Shenzhen is expanded from 60 000 m3/d to 160 000 m3/d. The designed effluent quality is upgraded from the Class I B standard in the Discharge Standard of Pollutants from Municipal Wastewater Treatment Plant (GB18918-2002) to Quasi IV class water standard in Environmental Quality Standards for Surface Water (GB3838-2002). The actual land area of this project is only 4.2 hm2. Through the demolition of the original structures, a set of sewage treatment facilities with a design scale of 160,000 m3/d is newly built. The technological process of multi-stage AO biological reaction tank + double-layer secondary sedimentation tank + magnetic coagulation sedimentation tank + UV disinfection is adopted in the upgrading and expansion project. The total investment of this project is 521.65 million rmb, and the operating cost is 1.13 rmb/m3. The main part of this project was completed and opened to water in 2019. The effluent water quality can stably reach the Quasi-IV water standard.

    参考文献
    相似文献
    引证文献
引用本文

沙超,张瀚中.深圳市某污水处理厂提标扩容工程节地工艺设计方案[J].城市道桥与防洪,2021,(7):162-165.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2020-12-21
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2021-10-17
  • 出版日期:
关闭