Abstract:Taking the 8-porous frame culvert structure used in Ningbo City Yuntaishan Road Underpassing Beilun Railway Project as an example, the finite element mechanical model is established to analyze the mechanical characteristics of 8-porous frame culvert jacking process in the soft soil area of Ningbo. The given conclusion not only guides the engineering construction and the construction monitoring, but also can provide the reference for the jacking engineering of the porous frame culverts in the other soft soil areas.