The reconstruction technology of old cement concrete pavement is further studied. The applicable conditions of various reconstruction technologies under two different schemes of pavement reconstruction scheme and overlay scheme are put forward. The key and difficult problems for attention in the reconstruction process are clarified. The decision-making block diagram of old concrete pavement reconstruction technology in China under the existing standard system is perfected. The important reference can be provided for the research work and engineering practice of the similar reconstruction projects.