Abstract:Taking the Jinhuigang Cable-stayed Bridge as an example, focusing on the important and difficult construction technologies in the positioning, hoisting and concreting of steel-concrete composite section of its special-shaped pylon, the corresponding measures for the design of positioning support, accurate hoisting in place, construction control of rebar and pre-stressed steel beam, and concrete construction technology are put forward, which can be referred for the construction of the similar projects.