Abstract:In recent years, with the increasing of sluice consolidation and design work, the calculation and analysis on the stability of sluice chamber with pile foundation is becoming more important. Combined with a sluice project in Fenghua District of Ningbo, the combined method of excel and Lizheng software is used to consider the eccentric compression at the upper of sluice chamber floor. The calculation process is simplified and the analysis process is sorted out. The results can provide the reference for the calculation work of sluice chamber in the future.