Abstract:Take Dongzhu Road (Zhuzhou Section) Rapid Reconstruction Project as an example, the construction background and engineering overview of the project are introduced. The construction conditions of the rapid reconstruction are analyzed. The overall layout of the whole line is put forward. Each node scheme is studied according to the present conditions.