Abstract:Combined with the engineering case of some stations in Shanghai Metro Line 15 and the experience in the related traffic organization, the selection thinking in the layout position of rail transit station and the matching requirements for the different modes of traffic organization are expounded in order to provide the reference for the construction of the other urban metros.