Abstract:Aiming at the general route selection and the river-crossing method of the first traffic river-crossing channel of Guangzhou - Foshan Co-construction Demonstration Pilot Area, many schemes are further compared and selected. On the basis of analyzing the key control factors of the river-crossing channel project, four alignments of Line A, Line B, Line C and Line K are compared. Two river-crossing schemes of bridge and tunnel are compared and selected from whether or not to meet the urban planning development, to affect the natural environment, to satisfy the benefits of the residents along the line. The sinking pipe method and shield method of tunnel construction are compared from the control factors, and the horizontal and longitudinal layouts. After the multiple scheme comparison, finally, a feasibly recommended scheme is determined in consideration of the benefits of all.