Abstract:Combined with an engineering example, the restoration project of Dajian Road (Huangshui Section) of the elevated road along Chengdu Metro Line 10 after the completion of the metro is introduced. The original roads of this project are upgraded and reconstructed under the premise of meeting the using functions, and the original roads are utilized to the maximum extent. The relevant design experience can be referred by the relevant professionals.