Abstract:Taking the Xuwei New District Standard Tail Water Sea Drainage Project as an example, the construction of offshore pipeline connection is greatly affected by sea winds and waves as well as water levels. The coastal mud flat area is deep and thick with silt. There are surrounding factors with the high protection requirements such as breakwaters, sea dikes, and breeding areas and the others. The construction is difficult. The key technologies of offshore connection of the different diameters of pipe jacking section and pipe laying section are introduced. The rationality and reliability of the scheme are analyzed, calculated and rechecked. The results can be referred for the similar projects.