Abstract:Combined with Yancheng Major Livelihood Project - Yancheng New Water Sources and Diversion Project, the casing pipe setup, soil covering thickness, wall thickness and horizontal spacing of DN2600 parallel jacking pipe crossing expressway, and the minimum longitudinal spacing design parameters of pipe jacking construction are studied. The theoretical and actual measuring study on the pavement settlement caused by the parallel pipe jacking crossing under expressway is carried out. Combined with the engineering practice, the ground deformation mechanism and deformation causes caused by the large caliber parallel pipe jacking construction are analyzed, which can be referred for the design of the projects of large caliber parallel pipe jacking crossing the high-grade roads.