Abstract:The prefabricated assembly technology is more and more widely applied in the urban elevated bridges because of its green environmental protection, convenient and fast construction, good quality control and other advantages. Taking the North Ring II Road in Zhejiang Province Shaoxing City Intelligent Expressway Project as an example, the application of prefabricated assembly technology in engineering is introduced. Small box beam is adopted for the standard section of superstructure. The steel and concrete composite girder or steel box girder are used at the node position. The prefabricated bent cap and prefabricated stand column are adopted for the substructure. The prefabricated crash walls are used for the auxiliary structures. The design and construction scheme of prefabricated bent cap are specially introduced, which can be referred for the similar projects.