Abstract:Because of its high bearing capacity, low construction noise and vibration, and strong adaptability of pile diameter to geology, the bored cast-in-place pile has been used more and more in the projects. Relying on a deep water bridge pile foundation project, the causes and prevention measures of common quality defects in the construction of water bored cast-in-place pile from the aspects of steel casing construction, drilling construction, fabrication and installation of steel cage, concrete pouring into piles, etc. are introduced, which can provide the references for improving the construction level of water bored cast-in-place pile.