Abstract:As a common bridge structure, the continuous steel box girder has the characteristics of strong spanning capacity, fast construction period and good landscape effect. In recent years, with the development of bridge construction methods and capacity, more and more steel box girder bridges are constructed by incremental launching. Taking Runyang River Bridge in Yangzijin Road of Yangzhou City as an example, the structural design and key technology of continuous steel box girder constructed by incremental launching are introduced in detail. The finite element model of bridge is established to analyze the structural stress of the bridge in operation and construction stages. And the rationality of the design is expounded, which can provide reference for the design and construction of similar bridges.