Abstract:For continuous composite girder bridge, the tension of deck in negative moment area of fulcrum is the key control point of design, especially for long-span steel truss composite girder bridge. At the same time, the attention should be paid to the sudden change of the internal force of the lower chord of the truss in the negative moment area in design. Based on an actual project, the key technology for the design of new long-span continuous steel truss composite girder bridge is introduced in detail. The cracking problem of the concrete bridge deck is solved by formulating a reasonable construction process. The compression stability problem of the lower chord is solved by pouring the concrete into the lower chord to form a double composite section.